Chris Knight

 TSBE EngD Research Engineer Chris Knight

 

 

Where are they now?

 Please see Chris's LinkedIn profile.

Thesis

 Energy Storage on RTG Cranes

Project

In 2010 UK port operations accounted for 2% of the UK's total emissions, in order to meet Government targets this will need to be reduced. Research shows that a potential reduction could be achieved by improving the efficiency of the cranes used at port sites. Port of Felixstowe is the largest container port in the UK and one of the largest in Europe. The cranes used there are RTG Cranes. The project  developed an energy storage system that can be integrated on board RTG Cranes and a control strategy to regulate the energy flow around the cranes power system.
 

Publications:

Knight, C.E.; Becerra, V.; Holderbaum, W.; Mayer, R., "Modelling and simulating the operation of RTG container cranes," Power Electronics, Machines and Drives (PEMD 2012), 6th IET International Conference on , vol., no., pp.1,6, 27-29 March 2012 doi: 10.1049/cp.2012.0362
URL: http://ieeexplore.ieee.org/stamp/stamp.jsptp
=&arnumber=6242214&isnumber=6241991

 


 

 

 

Contact us

Page navigation

 

Search Form

A-Z lists