CE3CIC-International Construction

Module Provider: School of Construction Management and Engineering, School of Built Environment
Number of credits: 10 [5 ECTS credits]
Level:6
Terms in which taught: Spring term module
Pre-requisites:
Non-modular pre-requisites:
Co-requisites:
Modules excluded:
Current from: 2018/9

Module Convenor: Prof Roger Flanagan

Email: r.flanagan@reading.ac.uk

Type of module:

Summary module description:
An examination of the organisation and structure of the world’s construction market, including the size, employment statistics and the scope of work, in addition a review of the organisation of the major international construction and design companies, that will also explore the key differences when buying design and construction services around the world.

Aims:
To provide the knowledge and understanding necessary to examine the organisation and structure of the world’s construction market, as well as be able to review the organisation of the major international construction and design companies and the way that they operate.Have an understanding of the regulatory framework and the codes and standards used in international construction.

Assessable learning outcomes:

  • Identifying how the social and political environments shape the way that the construction industry operates in any country.
  • Awareness of the different approaches to buying design and construction in the international market
  • Explaining how the European, North American and Japanese construction industries
work and their different methods of procurement.
  • Ensuring that students think globally and act locally.
  • Identification of the drivers and issues that impact the international engineering and construction market.
  • Understanding the importance of compliance with the UN Global Compact.

Additional outcomes:

  • Group presentation enhances the development of oral skills and team working.

Outline content:

  • The organisation and structure of the world's construction market, including the size, employment statistics, the scope of work.
  • The organisation of the major international construction and design companies.
  • The key difference when buying design and construction services around the world.
  • A detailed investigation of the European, North American and Japanese construction industries. Looking at how cost, speed, quality, safety and labour relations are managed. Consider the advantages and disadvantages of the three markets.
  • Construction in the developing markets of Asia, Africa and South America.Focusing on the emerging market of China, and the behaviour of Chinese companies .
  • Strategies for entry into a market including take-overs, mergers, and strategic alliances.
  • Maintaining competitive advantage for companies. What differentiates winners from losers.

Brief description of teaching and learning methods:
Lectures, Tutorials and Private Study

Contact hours:
  Autumn Spring Summer
Lectures 20
Tutorials 10
Guided independent study 70
       
Total hours by term 100.00
       
Total hours for module 100.00

Summative Assessment Methods:
Method Percentage
Written exam 100

Summative assessment- Examinations:
One two-hour examination

Summative assessment- Coursework and in-class tests:

Formative assessment methods:

Penalties for late submission:


Assessment requirements for a pass:
A mark of 40%

Reassessment arrangements:
Re-examination in August/ September

Additional Costs (specified where applicable):
1) Required text books:
2) Specialist equipment or materials:
3) Specialist clothing, footwear or headgear:
4) Printing and binding:
5) Computers and devices with a particular specification:
6) Travel, accommodation and subsistence:

Last updated: 20 April 2018

THE INFORMATION CONTAINED IN THIS MODULE DESCRIPTION DOES NOT FORM ANY PART OF A STUDENT'S CONTRACT.

Things to do now