Publications

Please see below for a selection of published papers in the ICRC.  For publications relating to specific ICRC members, please visit the relevant People Profile page.

Jump to: 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | 2005 | 2004 | 2003 | 2002 | 2001 | 2000 | 1999 | 1998 | 1997 | 1996 | 1995 | 1994 | 1993 | 1992 | 1991 | 1990 | 1989 | 1988 | 1987 | 1984
Number of items at this level: 291.

2012

Collinge, B. (2012) Re-thinking stakeholder management in construction: theory & research. Project Perspectives, 34. pp. 16-23. ISSN 1455-4178

Zhou, W., Whyte, J. and Sacks, R. (2012) Construction safety and digital design: a review. Automation in Construction, 22. pp. 102-111. ISSN 0926-5805

2011

Brown, A. D. and Phua, F. T.T. (2011) Subjectively construed identities and discourse: towards a research agenda for construction management. Construction Management and Economics, 29 (1). pp. 83-95. ISSN 0144-6193

Collinge, B. (2011) Re-thinking stakeholder management in construction: theory & research. In: 6th Nordic Conference on Construction Economics and Organisation, 13-15 April 2011, Copenhagen, Demmark, pp. 1-12.

Collinge, B. (2011) Understanding stakeholder requirements on an NHS hospital project: application of semiotics-rooted theories. In: 27th ARCOM annual conference, 5th-7th September, Bristol, UK, pp. 963-972.

Dunn, K., Loosemore, M., Phua, F. and Ozguc, U. (2011) Everyday ethnic diversity and racism on Australian construction sites. The International Journal of Diversity in Organizations, Communities and Nations, 10 (6). pp. 129-148. ISSN 1447-9532

Elmualim, A. A. and Williams, M. (2011) Considering users’ factors in sustainable building refurbishment projects. In: World Renewable Energy Congress 2011, 8-11th May 2011, Linköping , Sweden, pp. 1805-1812.

Green, S. D. (2011) Making sense of construction improvement. Wiley-Blackwell, Oxford, pp392. ISBN 9781405130462

Gruneberg, S. and Hughes, W. (2011) A review of performance-based contracting. RICS Research. Report. Royal Institution of Chartered Suveyors, London. pp82. ISBN 9781842196236

Han, I. X., Zhou, W. and Tang, L. C. M. (2011) Model-based life cycle cost and assessment tool for sustainable building design decision. In: 4th International Conference on Construction Engineering and Project Management (ICCEPM-20011) , 16-18 Feb 2011, Sydney, Australia.

Kwawu, W. and Elmualim, A. A. (2011) Sustainability in facilities management: a review of drivers and policy issues. In: Egbu, C. and Lou, E.C.W. (eds.) Proceedings 27th Annual ARCOM Conference. ARCOM, pp. 1185-1194. ISBN 9780955239052

Laryea, S. (2011) Built environment education and research in West Africa. In: Laryea, S., Leiringer, R. T. F. and Hughes, W. (eds.) Proceedings of the West Africa Built Environment Research (WABER) Conference 2011. West Africa Built Environment Research (WABER) Conference, pp. 203-214. ISBN 9780956606020

Laryea, S. (2011) Quality of tender documents: case studies from the UK. Construction Management and Economics, 29 (3). pp. 275-286. ISSN 0144-6193

Laryea, S. and Hughes, W. (2011) Negotiating access into firms: obstacles and strategies. In: 6th Nordic Conference on Construction Economics and Organisation, 13-16 April 2011, Copenhagen, Demmark, pp. 577-586.

Laryea, S. and Hughes, W. (2011) Risk and price in the bidding process of contractors. Journal of Construction and Engineering Management, 137 (4). pp. 248-258. ISSN 0733-9364

Laryea, S. and Leiringer, R. T. F. (2011) Built environment research in West Africa current trends and future directions. In: CIB-W107 International Conference on Innovation and Sustainable Construction in Developing Countries, November 1-3, 2011, Daewoo Hotel in Hanoi, Vietnam. (In Press)

Laryea, S., Leiringer, R. T. F. and Hughes, W., eds. (2011) Keynotes, programme and abstracts of the West Africa Built Environment Research (WABER) Conference 2011. West Africa Built Environment Research (WABER) Conference, Accra, Ghana, pp141. ISBN 9780956606020

Laryea, S., Leiringer, R. T. F. and Hughes, W., eds. (2011) Proceedings of the West Africa Built Environment Research (WABER) Conference 2011. Proceedings of the WABER Conference 2011. West Africa Built Environment Research (WABER) Conference, Accra, Ghana, pp991. ISBN 9780956606013 (In Press)

Lindkvist, C., Hassan Ibrahim, N. and Whyte, J. (2011) Disjointed memory: forgetting within and across firms. In: "Organizational Memory" Seventeenth Organization Science Winter Conference (OSWC XVII), 10-13 Feb 2011, Steamboat Springs, Colorado, USA.

Loosemore, M., Phua, F. T. T., Dunn, K. and Ozguc, U. (2011) The politics of sameness in the Australian construction industry: comparing operative and manager attitudes towards cultural diversity. Engineering, Construction and Architectural Management, 18 (4). pp. 363-380. ISSN 0969-9988

Lu, S.-L. (2011) System innovation for sustainable built environments: the case of light emitting diodes. In: Proceedings of the CIB International Conference Management and Innovation for a Sustainable Built Environment - MISBE2011, 20 – 23 June 2011, Amsterdam, The Netherlands. (ISBN: 9789052693958)

Thompson, E.R. and Phua, F.T.T. (2011) A brief index of affective job satisfaction. Group & Organization Management. ISSN 1059-6011 (In Press)

Tombesi, P. and Whyte, J. (2011) Challenges of design management in construction. In: Cooper , R., Junginger, S. and Lockwood, T. (eds.) The handbook of design management. Berg, London, UK. ISBN 9781847884886

Whyte, J. (2011) Managing digital coordination of design: emerging hybrid practices in an institutionalized project setting. Engineering Project Organization Journal, 1 (3). pp. 159-168. ISSN 2157-3735

Whyte, J. and Levitt, R. (2011) Information management and the management of projects. In: Morris, P. W. G., Pinto, J. K. and Söderlund, J. (eds.) The Oxford handbook of project management. Oxford University Press, UK, pp. 365-388. ISBN 9780199563142

Whyte, J. and Sexton, M. (2011) Motivations for innovation in the built environment: new directions for research. Building Research and Information, 39 (5). pp. 473-482. ISSN 1466-4321

Whyte, J. and Tryggestad , K. (2011) The visual in strategy practices: management, design and changing technologies of presentation. In: 2nd Workshop on Imagining Business, 19-20 May 2011, Segovia, Spain.

Zhou, W., Georgakis, P., Heesom, D. and Feng, X. (2011) A model-based groupware solution for distributed real-time collaborative 4D planning via teamwork. Journal of Computing in Civil Engineering. ISSN 1943-5487 (In Press)

2010

Bresnen, M. and Harty, C. (2010) Editorial: Objects, knowledge sharing and knowledge transformation in projects. Construction Management and Economics, 28 (6). pp. 549-555. ISSN 0144-6193

Dangerfield, B., Green, S. and Austin, S. (2010) Understanding construction competitiveness: the contribution of system dynamics. Construction Innovation: Information, Process, Management, 10 (4). pp. 408-420. ISSN 1471-4175

Driscoll , C. and Mann, P. (2010) WREN: electronic management system for facilities management. In: RICS COBRA, 2nd - 3rd September 2010, Paris, France.

Elmualim, A. (2010) Culture and leadership in stakeholder management. In: Construction Stakeholder Management. Wiley-Blackwell, London, pp. 174-192. ISBN 9781405180986

Elmualim, A., Shockley, D., Valle, R., Ludlow, G. and Shah , S. (2010) Barriers and commitment of facilities management profession to the sustainability agenda. Building and Environment, 45 (1). pp. 58-64. ISSN 0360-1323

Haroglu, H. (2010) Achieving whole-life value: The challenges of service-led construction. In: ARCOM 26th Annual Conference, 6th-8th September, Leeds.

Hughes, W., Kwawu, W. and Hillig, J.-B. (2010) Contracts and incentives in the construction sector. In: Caldwell, N. and Howard, M. (eds.) Procuring complex performance. Studies of Innovation in Product-Service Management. Routledge, New York, pp. 59-77. ISBN 9780415800051

Jewell, C., Flanagan, R. and Anac, C. (2010) Understanding UK construction professional services exports: definitions and characteristics. Construction Management and Economics, 28 (3). pp. 231-239. ISSN 0144-6193

Jewell, C. A. (2010) Exporting construction professional services in a global service economy. In: 20th Anniversary RESER Conference- The Resilience of the Global Service Economy, 30 Sept - 2 Oct 2010, Gothenburg, Sweden.

Kwawu, W., Elhag, T. and Ballal, T. (2010) Knowledge transfer processes in PFI: identification of barriers and enablers. In: Annual COBRA Conference, 2-3 September, Dauphine Universite, Paris.

Kwawu, W., Elhag, T. and Ballal, T. (2010) Knowledge transfer processes in PFI/PPP: critical success factors. In: 26th Annual ARCOM Conference, 6-8th September 2010, Leeds, pp. 839-848.

Laryea, S. (2010) Contractor project estimates vs. consultant project estimates in Ghana. In: The Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors, 2-3 September 2010, Dauphine Université, Paris.

Laryea, S. (2010) Health and safety on construction sites in Ghana. In: The Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors, 2-3 September 2010, Dauphine Université, Paris, France.

Laryea, S. (2010) Risk accountability in the tender process of contractors in Ghana and UK. International Journal of Project Organisation and Management. ISSN 1740-2905 (In Press)

Laryea, S. A. (2010) Challenges and opportunities facing contractors in Ghana. In: West Africa Built Environment Research (WABER) Conference, 27-28 July 2010, Accra, Ghana, 27-28 July 2010, Accra, Ghana, pp. 215-226.

Laryea, S. A. (2010) The evolution of indigenous contractors in Ghana. In: West Africa Built Environment Research (WABER) Conference, 27-28 July 2010, Accra, Ghana, pp. 579-588.

Laryea, S. A. (2010) Proceedings of the West Africa Built Environment Research (WABER) Conference 2010. Proceedings of the West Africa Built Environment Research (WABER) Conference 2010. West Africa Built Environment Research (WABER) Conference, Reading, UK, pp670. ISBN 9780956606006

Lindkvist, C. and Elmualim, A. (2010) An examination of actors that impact technology introduction to FM. In: 26th Annual ARCOM (Association of Researchers in Construction Management) Conference, 6-8 September, Leeds.

Lindkvist, C. and Elmualim, A. (2010) Innovation in facilities management: from trajectories to ownership. Facilities, 28 (9/10). pp. 405-415. ISSN 0263-2772

Loosemore , M. and Phua, F. (2010) Untangling rhetoric and reality in the CSR debate – the role of corporate social responsibility in effective business strategy. In: 26th Association of Researchers in Construction Management (ARCOM) Annual Conference, 6-8 September 2010, Leeds, UK.

Loosemore, M. and Phua, F. (2010) Responsible corporate strategy in construction and engineering: doing the right thing? Taylor & Francis, UK, pp192. ISBN 9780415459105

Loosemore, M. and Phua, F.T.T. (2010) Stakeholder engagement in managing risk. In: Proceedings: TG63 - Special Track 18th CIB World Building Congress, 11-13 May 2010, Salford, UK, pp. 171-182.

Loosemore, M., Phua, F.T.T., Dunn, K. and Ozguc, U. (2010) Operatives’ experiences of cultural diversity on Australian construction sites. Construction Management and Economics, 28 (2). pp. 177-188. ISSN 0144-6193

Lu, S.-L. and Sexton, M. (2010) Career journeys and turning points of senior female managers in small construction firms. Construction Management and Economics, 28 (2). pp. 125-139. ISSN 0144-6193

Lu, S.-L. and Sexton, M. G. (2010) New high technology product development: The case of light emitting diodes. In: CIB World Congress, 10-13 May 2010, Salford Quays, UK.

Luck, R. (2010) Using objects to coordinate design activity in interaction. Construction Management and Economics, 28 (7). pp. 641-655. ISSN 0144-6193

Luck, R. and Ikeya , N. (2010) “So the big rocks we put in the jar”: using situated reasoning to coordinate design activity. In: Studying Professional Software Designers, 8-10th February, University of California, USA.

Mann, P. (2010) Implications of Commons Act 2006 for the registration of land as a town or village green. In: RICS COBRA, 2nd - 3rd September 2010, Paris, France.

Mann, P. (2010) Intellectual property law on architectural design in collaborative design communication as digital assets. In: The Society of Legal Scholars Conference, Southampton 2010, 13th – 16th September 2010, Southampton , UK.

Mann, P. (2010) Who owns the copyright of architectural works and designs? In: RICS COBRA Legal Research Symposium, 2nd - 3rd September 2010, Paris, France.

Phua, F.T.T., Loosemore, M., Dunn, K. and Ozguc, U. (2010) Barriers to integration and attitudes towards cultural diversity in the construction industry. In: Proceedings: TG65 and W065 - Special Track. 18th CIB World Congress, 11-13 May 2010, Salford, UK, pp. 414-422.

Raja, J. Z., Green, S. D. and Leiringer, R. T. F. (2010) Concurrent and disconnected change programmes: strategies in support of servitization and the implementation of business partnering. Human Resource Management Journal, 20 (3). pp. 258-276. ISSN 1748-8583

Sacks, R., Radosavljevic, M. and Barak, R. (2010) Requirements for building information modeling based lean production management systems for construction. Automation in Construction , 19 (5). pp. 641-655. ISSN 0926-5805

Schweber, L. and Harty, C. (2010) Actors and objects: A socio-technical networks approach for construction management research. Construction Management and Economics, 28 (6). pp. 657-674. ISSN 0144-6193

Schweber, L. and Leiringer, R. (2010) Managing multiple markets: big firms and PFI. Building Research and Information, 38 (2). pp. 131-143. ISSN 0961-3218

Tah, J.H.M., Zhou, W., Abanda, F.H. and Cheung, F.K.T. (2010) Towards a holistic modelling framework for embodied carbon and waste in the building lifecycle. In: The International Conference on Computing in Civil and Building Engineering (ISCCBE) , 30 June - 2 July 2010, University of Nottingham.

Tang, L. C. M., Leung, A.Y.T. and Wong, C.W.Y. (2010) Entropic risk analysis by a high level decision support system (e-FDSS) for construction SMEs. Journal of Computing in Civil Engineering, 24 (1). pp. 81-94. ISSN 0887-3801

Tang, L. C. M., Zhao, Y., Austin, S.A., Darlington, M.J. and Culley, S.J. (2010) Codification vs personalisation: A study of the information evaluation practice between aerospace and construction industries. International Journal of Information Management, 30 (4). pp. 315-325. ISSN 0268-4012

Tutt, D. (2010) Ethnographic methodologies for construction research: knowing, practice and interventions. Building Research and Information, 38 (6). pp. 647-659. ISSN 0961-3218

Whyte, J. (2010) Coordination and control: digital objects as infrastructure in organizational settings. In: Academy of Management, 6-10 Aug 2010, Montreal, Canada.

Whyte, J. (2010) Cultures of coordination and control: integrated software solutions and new forms of organizing. In: European Group for Organization Studies (EGOS), 1-3 July 2010, Lisbon, Portugal.

Whyte, J. (2010) Digital infrastructure, management practices and the design organization. In: Proceedings: TG65 and W065 - Special Track. 18th CIB World Building Congress, 10-13 May 2010, Salford, UK, pp. 288-300.

Whyte, J. (2010) Software integration: complex products and project-based innovation in the digital economy. In: British Academy of Management, 13-16 Sept 2010, Sheffield.

Whyte, J. (2010) Strategic organization in projects and firms through software integration. In: Engineering Project Organization Conference (EPOC), November 4-6 2010, Stanford Sierra, Lake Tahoe, CA.

Whyte, J. (2010) Taking time to understand: articulating relationships between technologies and organizations. Research in the Sociology of Organizations, 29. pp. 217-236. ISSN 0733-558X

Whyte, J. and Lobo, S. (2010) Coordination and control in project-based work: digital objects and infrastructures for delivery. Construction Management and Economics, 28 (6). pp. 557-567. ISSN 0144-6193

Whyte, J. and Lobo, S. (2010) Digital objects and management practices on engineering design projects. In: Construction Matters, 5-7 May 2010, Copenhagen Business School, Copenhagen, Denmark.

Whyte, J., Lobo , S., Neller, M. and Bowden, S. (2010) Digital infrastructure and changing practices in engineering design. In: Arup Research Review. Arup Research Review, 2010 (2010). Arup, London, pp. 50-53.

2009

Dan-Asabe, D. and Radosavljevic, M. (2009) Do construction companies need to match employees' expectations? In: 25th Annual ARCOM Conference, 7-9 September, Nottingham, UK, pp. 1223-1232.

Flanagan, R. and Jewell, C. A. (2009) Economics, urbanisation and infrastructure. In: State of the World, FIDIC Infrastructure Report. FIDIC - International Federation of Consulting Engineers, Geneva, pp. 5-11.

Flanagan, R., Jewell, C. and Anac, C. (2009) A review of growth for construction service companies in global markets. In: Fifth International Conference on Construction in the 21st Century (CITC-V) “Collaboration and Integration in Engineering, Management and Technology”, 20-22 May 2009, Istanbul, Turkey, pp. 950-958.

Laryea, S. (2009) Subcontract and supply enquiries in the tender process of contractors. Construction Management and Economics, 27 (12). pp. 1219-1230. ISSN 0144-6193

Leiringer, R., Green, S. D. and Raja, J. (2009) Living up to the value agenda: the empirical realities of through-life value creation in construction. Construction Management and Economics, 27 (3). pp. 271-285. ISSN 1466-433X

Lindkvist, C. and Elmualim, A. (2009) Pervasive technologies for workspace management. Journal of Facilities Management, 7 (2). pp. 98-110. ISSN 1472-5967

Loosemore, M., Phua, F.T.T., Dunn, K. and Ozguc, U. (2009) Operative experiences of cultural diversity on Australian construction sites. In: CIB W099 Planning, Designing and Building a Healthy and Safe Construction Industry Conference, 21-23 October 2009, Melbourne, Australia.

Luck, R. (2009) 'Does this compromise your design?' socially producing a design concept in Talk-in-Interaction. In: McDonnell, J. and Lloyd, P. (eds.) About designing: analysing design meetings. Taylor & Francis , London, pp. 233-250. ISBN 9780415440585

Nishiyama, D. and Radosavljevic, M. (2009) Mathematical modelling of decision making processes in construction projects. In: 25th Annual ARCOM Conference, 7-9 September, Nottingham, UK, pp. 85-94.

Senaratne, S. and Sexton, M. (2009) Role of knowledge in managing construction change. Engineering, Construction and Architectural Management, 16 (2). pp. 186-200. ISSN 0969-9988

Sergeeva, N. and Radosavljevic, M. (2009) The influence of individual characteristics on employee creative participation. In: 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK, pp. 97-104.

2008

Abbott, C., Barrett, P., Ruddock, L. and Sexton, M. G. (2008) Hidden innovation in the construction and property sectors. FiBRE: Findings in Built and Rural Environments. Report. Royal Institution of Chartered Surveyors, UK. pp8.

Barrett, P., Sexton, M. G. and Lee, A. (2008) Innovation in small construction firms. Routledge, London, UK. ISBN 9780415393904

Brandon, P. S. and Lu, S.-L., eds. (2008) Clients driving innovation. Wiley- Blackwell, Oxford, UK, pp296. ISBN 9781405175661

Darlington, M.J., Culley, S.J., Zhao, Y., Austin, S.A. and Tang, L. C. M. (2008) Defining a framework for the evaluation of information. International Journal of Information Quality, 2 (2). pp. 115-132.

Green, S. (2008) The evolution of corporate social responsibility in construction: defining the parameters. In: Murray, A. and Dainty, M. (eds.) Corporate Social Responsibility in the Construction Industry. Taylor & Francis, Abingdon, pp. 24-53. ISBN 9780415362078

Laryea, S. (2008) Risk pricing practices in finance, insurance and construction. In: COBRA 2008 The construction and building research conference of the Royal Institution of Chartered Surveyors, 4-5 September 2008, Dublin Institute of Technology.

Laryea, S. (2008) The tendering process and performance analysis of a public building project in Ghana. In: COBRA 2008 The construction and building research conference of the Royal Institution of Chartered Surveyors, 4-5 September 2008, Dublin Institute of Technology.

Lu, S.-L. (2008) The role of the client in the innovation processes of small construction professional service. In: Brandon, P. S. and Lu, S.-L. (eds.) Clients Driving Innovation. Wiley-Blackwell, pp. 111-124. ISBN 9781405175661

Lu, S.-L. and Sexton, M. (2008) The evolution of sustainable development. In: Murray, M. and Dainty, A. (eds.) Corporate Social Responsibility in the Construction Industry. Taylor & Francis, pp. 191-213. ISBN 9780415362085

Lu, S.-L. and Sexton, M. (2008) Key characteristics of small construction firms: a United Kingdom perspective. In: CIB W055 - W065 Joint International Symposium: 'Transformation Through Construction', 15-17 November 2008, Dubai, UAE.

Lu, S.-L. and Sexton, M. (2008) Senior female managers in small construction firms within the North West of England: an update. In: 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK, pp. 921-929. (Association of Researchers in Construction Management, Vol. 2. ISBN: 9780955239014)

Radosavljevic, M. (2008) Autopoiesis vs. social autopoiesis: critical evaluation and implications for understanding firms as autopoietic social systems. International Journal of General Systems, 37 (2). pp. 215-230. ISSN 1563-5104

Radosavljevic, M. and Dan-Asabe, D. (2008) How could construction supply chain benefit from RFID/GPS integration: a knowledge management perspective. In: Lima, C. P. and Bauer, M. (eds.) Information and knowledge management - helping the practitioner in planning and building. Proceedings of the CIB W102 3rd International Conference 2007. Fraunhofer IRB Verlag, Germany, pp. 165-174. ISBN 9783816775560

Sexton, M. and Senaratne, S. (2008) Managing construction project change: a knowledge management perspective. Construction Management and Economics, 26 (12). pp. 1303-1311. ISSN 0144-6193

Sexton, M., Abbot, C. and Lu, S.-L. (2008) Challenging the illusion of the all powerful clients' role in driving innovation. In: Brandon, P. S. and Lu , S.-L. (eds.) Clients Driving Innovation. Wiley-Blackwell, pp. 43-48. ISBN 9781405175661

Tang, L. C. M., Zhao, Y., Austin, S. A., Darlington, M. J. and Culley, S. J. (2008) Knowledge and information evaluation practice: an exploratory study in a construction firm. In: Lima, C. P. and Bauer, M. (eds.) Information and knowledge management - helping the practitioner in planning and building. Proceedings of the CIB W102 3rd International Conference 2007. Fraunhofer IRB Verlag, Germany, pp. 213-222. ISBN 9783816775560

2007

Abbott, C., Sexton, M., Jones, V. and Lu, S.-L. (2007) Action learning as an enabler for technology transfer. In: 2nd International Conference on World of Construction Project Management WCPM200 7, pp. 1-42.

Clements-Croome, D. J. (2007) A triz based value management process for selecting façade solutions. The Value Manager, 13 (2). pp. 3-8. ISSN 1029-0982

Goulding, J., Sexton, M. G., Zhang, X., Kagioglou, M., Aouad, G. and Barrett, P. (2007) Technology adoption: breaking down barriers using a virtual reality design support tool for hybrid concrete. Construction Management and Economics, 25 (12). pp. 1239-1250. ISSN 0144-6193

Ingirige, B. and Sexton, M. G. (2007) Intranets in large construction organizations: exploring advancements, capabilities and barriers. ITcon, 12. pp. 409-427. ISSN 1874-4753

Ingirige, B. and Sexton, M. G. (2007) Understanding construction alliances: their rationale and design. RICS Research Paper Series, 7 (4). pp. 5-33.

Laryea, S. (2007) The price of risk in construction projects: contingency approximation model (CAM). In: 5th International Conference on Construction Project Management / 2nd International Conference on Construction Engineering and Management, 1-2 March 2007, Nanyang Technological University, Singapore.

Laryea, S. A. (2007) An experimental approach to project risk identification and prioritization. In: Construction Management and Economics 25th Anniversary Conference, 15-18 July 2007, University of Reading, UK.

Lee, A. and Sexton, M. G. (2007) nD modeling: industry uptake considerations. Construction Innovation: Information, Process, Management, 7 (3). pp. 288-302. ISSN 1471-4175

Lu, S.-L., Abbott, C., Jones, V. and Sexton, M. (2007) The role of innovation circles in stimulating innovation in small construction firms. In: 4th International SCRI Research Symposium, 26-27 Mar 2007, Salford, UK, pp. 199-2010.

Phua, F. (2007) Does senior executive’s perception of environmental uncertainty affect the strategic functions of construction firms? International Journal of Project Management, 25 (8). pp. 753-761. ISSN 0263-7863

Phua, F. T. T. (2007) Examining the factors that lead to construction project success: the influence of ‘good’ project fees. In: London, K., Thayarapan, G. and Chen, J. (eds.) Symposium : building across bordersbuilt environment procurement CIB W092 procurement systems. CIBER, University of Newcastle, Australia. ISBN 9781920701834

Radosavljevic, M. (2007) General systems perspective on achieving continuous synergy in a project organisation. In: Construction Management and Economics 25th Anniversary Conference, 16-18 July 2007, University of Reading, UK.

Radosavljevic, M. (2007) Promoting innovation and exceptional performance in the Scottish construction industry. In: 27th Conference on Entrepreneurship and Innovation, 21-22 March 2007, Maribor, Slovenia.

Radosavljevic, M. and Horner, R. M. W. (2007) Process planning methodology: dynamic short-term planning for off-site construction in Slovenia. Construction Management and Economics, 25 (2). pp. 143-156. ISSN 0144-6193

Sexton, M., Kähkönen, K. and Lu, S.-L. (2007) CIB priority theme - Revaluing construction: a W065 'organisation and management of construction' perspective. CIB Reports. 313. Report. CIB, Rotterdam. ISBN 9789063630539

Tzortzopoulis, P. and Sexton, M. G. (2007) An investigation on the implementation on product development process models in construction companies. Construction Management and Economics, 25 (11). pp. 1153-1164. ISSN 0144-6193

Zhao, Y., Tang, L. C. M., Darlington, M. J., Austin, S. A. and Culley, S. J. (2007) Establishing information valuing characteristics for engineering design information. In: Proceedings of the 16th International Conference on Engineering Design (ICED07). The Design Society, pp. 537-538. ISBN 1904670016 (Full paper number: DS42_P_144)

Zhao, Y., Tang, L. C. M., Darlington, M. J., Austin, S. A. and Culley, S. J. (2007) High value information in engineering organisations. In: KIM Project Conference 2007, 28-29 March 2007, Loughborough University, UK.

2006

Barrett, P. and Sexton, M. G. (2006) Innovation in small, project-based construction firms. British Journal of Management, 17 (4). pp. 331-346. ISSN 1467-8551

Gibson, V. and Luck, R. (2006) Longitudinal analysis of corporate real estate practice: changes in CRE strategy policies, functions and activities. Facilities, 24 (3/4). pp. 74-89. ISSN 0263-2772

Ingirige, B. and Sexton, M. G. (2006) Alliances in construction: investigating initiatives and barriers for long-term collaboration. Engineering, Construction and Architectural Management, 13 (5). pp. 521-535. ISSN 0969-9988

Lu, S.-L. and Sexton, M. (2006) ACTION: A checklist for the action researcher. In: 3rd International SCRI Research Symposium, 3-4 Apr 2006, Delft, The Netherlands, pp. 589-597.

Lu, S.-L. and Sexton, M. (2006) Exploitative innovation in large professional service firms. In: Joint International Symposium of CIB Working Commissions: W65 and W55, 18-20 Oct 2006, Rome, Italy.

Lu, S.-L. and Sexton, M. (2006) Innovation in small construction knowledge-intensive professional service firms. RICS Research Paper Series, 6 (14). pp. 1-52. ISSN 1464-648X

Lu, S.-L. and Sexton, M. (2006) Innovation in small construction knowledge-intensive professional service firms: a case study of an architectural practice. Construction Management and Economics, 24 (12). pp. 1269-1282. ISSN 1466-433X

Lu, S.-L. and Sexton, M. (2006) Women in NW construction SMEs. Project Report. University of Salford, Manchester.

Mann, P. and Garner, S. (2006) The role of sketches in supporting near-synchronous remote communication in computer supported collaborative design. In: Computer supported cooperative work in design II. Lecture Notes in Computer Science, 3865/2006. Springer, Berlin Heidelberg, pp. 72-81. ISBN 3540329692

Phua, F. (2006) Identifying the factors that influence the use of construction partnering as a procurement strategy. In: CIB 107 International Symposium on Construction In Developing Countries: Construction in Developing Economies: New Issues and Challenges, 18-20 January, Santiago, Chile. (Unpublished)

Phua, F. (2006) Predicting construction firm performance: an empirical assessment of the differential impact between industry-and firm-specific factors. Construction Management and Economics, 24 (3). pp. 309-320. ISSN 1466-433X

Phua, F. (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24 (6). pp. 615-624. ISSN 1466-433X

Phua, F.T.T. (2006) Examining the effects of senior executives’ perceived environmental uncertainty on the strategic functions of construction firms. In: 22nd Association of Researchers in Construction Management (ARCOM) Annual Conference, 4-6 September, Birmingham, UK, pp. 199-206.

Sexton, M. and Lu, S.-L. (2006) (Fr)agile innovation in small professional service firms. In: Proceedings of the 2nd Speciality Conference on Leadership in Construction, 4-6 May 2006, Grand Bahama Island, Bahamas, pp. 357-365.

Sexton, M. G., Barrett, P.S. and Aouad, G. (2006) Motivating small construction companies to adopt new technology. Building Research and Information, 34 (1). pp. 11-22. ISSN 1466-4321

Steen, J., Coopmans, C. and Whyte, J. (2006) Structure and agency? Actor-network theory and strategic organization. Strategic Organization, 4 (3). pp. 303-312. ISSN 1741-315X

Tang, L. C. M., Austin, S.A., Zhao, Y., Culley, S.J. and Darlington, M.J. (2006) Immortal information and through life knowledge management (KIM): how can valuable information be available in the future? In: The 3rd Asia-Pacific International Conference on Knowledge Management (KMAP 06), 11-15 December 1006, The Hong Kong Polytechnic University, Hong Kong. (Unpublished)

Tang, L. C. M., Leung, A.Y.T. and Lam, K.C. (2006) Entropy application to improve construction finance decisions. Journal of Construction Engineering and Management, 132 (10). pp. 1099-1113. ISSN 1943-7862

Tang, L. C. M., Wong, C.W.Y. and Leung, A.Y.T. (2006) Selection of funding schemes by a borrowing decision model: a Hong Kong case study. Construction Management and Economics, 24 (4). pp. 349-365. ISSN 1466-433X

Zhang, X., Goulding, J., Sexton, M. G., Aouad, G. and Kagioglou, M. (2006) HyCon: virtual prototyping in hybrid concrete construction frame design. Construction Innovation: Information, Process, Management, 6 (1). pp. 47-60. ISSN 1471-4175

2005

Alkizim, A. O. and Green, S. (2005) Robustness in value engineering. In: 21st Annual ARCOM Conference, 7-9 Sep 2005, SOAS, London, pp. 833-840.

Bouchlaghem, D., Shang, H., Whyte, J. and Ganah, A. (2005) Visualisation in architecture, engineering and construction (AEC). Automation in Construction, 14 (3). pp. 287-295. ISSN 0926-5805

Elmualim, A., Fernie, S. and Green, S. (2005) Harnessing the role of FM in the design processes through post-occupancy evaluation studies. In: 11th Joint CIB International Symposium: Combining forces - Advancing facilities management and construction through innovation, 13 - 16 Jun 2005, Helsinki, Finland, pp. 548-559.

Lam, K. C., Tang, C. M. and Lee, W. C. (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23 (2). pp. 127-145. ISSN 0144-6193

Luck, R. (2005) Design guidance sources. In: Bright, K. (ed.) Disability: making buildings accessible special report. 3rd edition. Workplace Law Network, pp. 121-127. ISBN 9781900648486

Nanayakkara, L. and Green, S. (2005) An empirical study of human resource management in the Sri Lankan construction industry. In: COBRA 2005: the construction research conference of the RICS Foundation, 4 - 5 Jul 2005, Brisbane, Australia.

Nanayakkara, L. and Green, S. (2005) The motivation of masons in the Sri Lankan construction industry. In: 11th Joint CIB International Symposium: Combining forces - Advancing facilities management and construction through innovation, 13 - 16 Jun 2005, Helsinki, Finland, pp. 229-239.

Pan, N., Has, H. and Lu, S.-L. (2005) Quality control using fuzzy fault tree analysis. Architectural Journal, 52 (2). pp. 1-17. ISSN 1016-3212

Phua, F. T. T. (2005) Determining the relationship between fee structure and project performance between firms: an empirical exploration based on institutional and task environment perspectives. Construction Management and Economics, 23 (1). pp. 45-56. ISSN 1466-433X

Phua, F. T. T. (2005) To what extent is project success determined by external environment factors? In: CIB W 92/TG 23/W 107 International Symposium: Construction procurement - the impact of cultural differences and systems on construction performance, 8-10 Feb 2005, Las Vegas, USA, pp. 433-438.

Sexton, M. and Barrett, P. (2005) Performance-based building and innovation: balancing client and industry needs. Building Research and Information, 33 (2). pp. 142-148. ISSN 0961-3218

Sexton, M., Goulding, J., Zhang, X., Kagioglou, M., Aouad, G., Cooper, R. and Barrett, P. (2005) The role of the HyCon design-support tool in elevating hybrid concrete as a design option for structural frames. Engineering, Construction and Architectural Management, 12 (6). pp. 568-586. ISSN 0969-9988

Soutter, J. K. and Whyte, J. K. (2005) Making sense of it all: implementing an emerging KM technology within the organization. International Journal of Information Technology and Management, 4 (3). pp. 308-320. ISSN 1741-5179

Tang, C. M., Wong, C. W. Y., Leung, A. Y. T. and Lam, K. C. (2005) A GA-based borrowing strategy for construction SMEs in Hong Kong. In: The 21st ARCOM Annual Conference 2005, 7-9 Sep 2005, London, pp. 301-305.

Tang, L. C. M. and Leung, A.Y.T. (2005) An impartial decision model for financial risk and decision analysis in construction projects. In: 21st ARCOM Annual Conference, 7-9 Sep 2005, London, pp. 893-904.

Tzortzopoulos, P., Sexton, M. and Cooper, R. (2005) Process models implementation in the construction industry. Engineering, Construction and Architectural Management, 12 (5). pp. 470-486. ISSN 0969-9988

Zhang , X., Sexton, M. G., Goulding, J. S., Aouad, G. and Kagioglou, M. (2005) Performance modelling for the design of a hybrid concrete frame. International Journal of Architectural Engineering and Design Management, 1 (2). pp. 83-91. ISSN 1745-2007

2004

Lu, S.-L. and Sexton, M. (2004) How do small knowledge-intensive professional service firms develop their sustainable competitive advantage through innovation. In: International Conference on Construction IT, 18th-21st February, Langkawi, Malaysia.

Lu, S.-L. and Sexton, M. (2004) Knowledge-based innovation in small knowledge-intensive professional service firms: an under developed research area? In: 4th International Postgraduate Research Conference on the Built and Human Environment, 1st-2nd April 2004, Salford, UK.

Phua, F. (2004) Improving construction cooperation: new theoretical insights into how and why. Current Directions in Real Estate and Construction. Research Studies Press, UK, pp199. ISBN 9780863802836

Phua, F. and Rowlinson, S. (2004) How important is cooperation to construction project success? A grounded empirical quantification. Engineering, Construction and Architectural Management, 11 (1). pp. 45-54. ISSN 0969-9988

Phua, F. and Rowlinson, S. (2004) Operationalizing culture in construction management research: a social identity perspective in the Hong Kong context. Construction Management and Economics, 22 (9). pp. 913-925. ISSN 0144-6193

Phua, F. and Rowlinson, S. (2004) A social identity approach to operationalizing culture in construction management research: the need for a new paradigm. In: Kalidindi, S. (ed.) Project Procurement for Infrastructure Construction. Alpha Science, Oxford, pp. 201-207. ISBN 9788173195914

Phua, F.T.T. (2004) The antecedents of cooperative behaviour among project team members: an alternative perspective on an old issue. Construction Management and Economics, 22 (10). pp. 1033-1045. ISSN 1466-433X

Phua, F.T.T. (2004) Modeling the determinants of multi-firm project success: a grounded exploration of differing participant perspectives. Construction Management and Economics, 22 (5). pp. 451-459. ISSN 0144-6193

Sexton, M. and Lu, S.-L. (2004) Appropriate research design for investigating innovation in small knowledge-intensive professional service firms. In: 20th Annual ARCOM Conference, 1st - 3rd September, Edinburgh, UK.

Sexton, M. G. and Barrett, P.S. (2004) The role of technology transfer in innovation within small construction firms. Engineering, Construction and Architectural Management, 11 (5). pp. 342-348. ISSN 0969-9988

Tang, L. C. M., Lee, S.W. and Long, N.D. (2004) A knowledge-based implementation of web and internet technology by construction design firms in Hong Kong. Journal of Building and Construction Management, 9 (1). pp. 73-84.

Van, L.T., Charoenngam, C.C., Long, N.D. and Tang, L. C. M. (2004) Construction lost-time injuries in Vietnam: an exploratory study. Journal of Building and Construction Management, 9 (1). pp. 85-90.

2003

Ballal, T. M. A. and Sher, W. (2003) Artificial neural network for the selection of buildable structural systems. Engineering, Construction and Architectural Management, 10 (4). pp. 263-271. ISSN 0969-9988

Cus-Babic, N., Rebolj, D., Magdic, A. and Radosavljevic, M. (2003) MC as a means for supporting information flow in construction processes. Concurrent Engineering: Research and Applications, 11 (1). pp. 37-46. ISSN 1063-293X

Luck, R. (2003) Dialogue in participatory design. Design Studies, 24 (6). pp. 523-535. ISSN 0142-694X (special issue 'Common ground')

Phua, F. and Rowlinson, S. (2003) Cultural differences as an explanatory variable for adversarial attitudes in the construction industry: the case of Hong Kong. Construction Management and Economics, 21 (7). pp. 777-785. ISSN 1466-433X

Sexton, M. G. and Barrett, P.S. (2003) Appropriate innovation in small construction firms. Construction Management and Economics, 21 (6). pp. 623-633. ISSN 1466-433X (special issue 'Innovation in the built environment')

Sexton, M. G. and Barrett, P.S. (2003) A literature synthesis of innovation in small construction firms: insights, ambiguities and questions. Construction Management and Economics, 21 (6). pp. 613-622. ISSN 1466-433X (special issue 'Innovation in the built environment')

Whyte, J. (2003) Innovation and users: virtual reality in the construction sector. Construction Management and Economics, 21 (6). pp. 565-572. ISSN 1466-433X (special issue 'Innovation in the built environment')

Whyte, J. and Gann, D. (2003) Design quality indicators: work in progress. Building Research & Information, 31 (5). pp. 387-398. ISSN 0961-3218

Whyte, J., Davies, A., Salter, A. and Gann, D. (2003) Designing to compete: lessons from Millennium Product winners. Design Studies, 24 (5). pp. 395-409. ISSN 0142-694X

Whyte, J., Gann, D. and Salter, A. (2003) Design quality indicator as a tool for thinking. Building Research and Information, 31 (5). pp. 318-333. ISSN 0961-3218

2002

Amor, R., Betts, M., Coetzee, G. and Sexton, M. (2002) Information technology for construction: recent work and future directions. Journal of Information Technology in Construction, 7. pp. 245-258. ISSN 1874-4753

Bon, R., Gibson, V. and Luck, R. (2002) Annual CREMRU-JCI survey of corporate real estate practices in Europe and North America: 1993-2001. Facilities, 20 (11-12). pp. 357-373. ISSN 0263-2772

Green, S. D. (2002) The human resource management implications of lean construction: critical perspectives and conceptual chasms. Journal of Construction Research, 3 (1). pp. 147-165. ISSN 1793-687X

Green, S., Williams, M. and Weller, S. (2002) Supply chain management: a contextual analysis of aerospace and construction. In: Joint Symposium CIB W092 / W063 / TG36 / TG23: procurement systems and technology transfer, 14-17 Jan 2002, University of the West Indies, Trinidad & Tobago, pp. 245-261.

Hughes, W. and Maeda, Y. (2002) Construction contract policy: do we mean what we say? RICS Research Papers, 4 (12). pp. 1-25.

Hughes, W., Hillebrandt, P.M., Greenwood, D.G. and Kwawu, W.E.K. (2002) Developing a system for assessing the costs associated with different procurement routes in the construction industry. In: CIB W-65 Organization and Management in Construction, 9-13 September 2002, Cincinnati, pp. 826-837.

Kao, C. C. and Green, S. D. (2002) The briefing process: a knowledge management perspective. In: CIB W096 Architectural Management (2001), 14-15 Sep 2001, Reading, UK, pp. 81-92.

Kumaraswamy, M., Rowlinson, S. and Phua, F. T. T. (2002) Accelerating cultural changes through innovative procurement processes: a Hong Kong perspective. Journal of Construction Procurement, 8 (1). pp. 3-16. ISSN 1358-9180

Kumaraswamy, M., Rowlinson, S. and Phua, F. T. T. (2002) Origins and desired destinations of construction project cultures. In: CIB World Building Congress 2001: Performance in Product and Practice, 2-6 April 2001, Wellington, New Zealand.

Kumaraswamy, M., Rowlinson, S., Rahman, M. and Phua, F. (2002) Strategies for triggering the required ‘Cultural Revolution’ in the construction industry. In: Fellows, R. F. (ed.) Perspectives on culture in construction. CIB, Rotterdam, pp. 268-285. ISBN 9063630301

Lam, K. C., Ng, S. T., Cheung, S. O. and Tang, C. M. (2002) The capital budgeting evaluation practices of building contractors in Hong Kong. Australian Journal of Construction Economics and Building, 2 (1). pp. 81-93. ISSN 1445-2634

Luck, R. (2002) Dialogue in participatory design. In: Design Research Society international conference: Common Ground, 5-7 Sep 2002, Brunel University, London, UK.

Mutti, C. d. N. and Hughes, W. (2002) Cash flow management in construction firms. In: 18th Annual ARCOM Conference, 2-4 Sep 2002, University of Northumbria, pp. 23-32.

Phua, F. T. T. (2002) Effects of cultural differences on project participants’ co-operative behaviour in construction projects: the case of Hong Kong. In: CIB international symposium on procurement systems, 14-17 Jan 2002, St Augustine, Trinidad & Tobago, pp. 497-513.

Weller, S., Green, S. and Williams, M. (2002) Knowledge sharing: a softly-softly approach. In: Joint Symposium CIB W092 / W063 / TG36 / TG23: procurement systems and technology transfer, 14-17 Jan 2002, University of the West Indies, Trinidad & Tobago, pp. 555-576.

Whyte, J. (2002) Implementation of VR systems: a comparison between the early adoption of CAD and current uptake of VR. Construction Innovation: Information, Process, Management, 2 (1). pp. 3-13. ISSN 1471-4175

Whyte, J. (2002) Virtual reality and the built environment. Architectural Press, Oxford, pp165. ISBN 0750653728

Whyte, J., Bouchlaghem, D. and Thorpe, T. (2002) IT implementation in the construction organization. Engineering, Construction and Architectural Management, 9 (5-6). pp. 371-379. ISSN 0969-9988

2001

Bon, R. and Luck, R. (2001) Annual CREMRU-JCI survey of corporate real estate practices in Europe and North America: 1993-2000. Facilities, 19 (11/12). pp. 386-395. ISSN 0263-2772

Bright, K., Cook, G. and Luck, R. (2001) Project Crystal: accessible environments for deaf and hard of hearing people. In: COBRA 2001: the construction research conference of the RICS Foundation, 23-24 Jun 2001, Strathclyde, Glasgow.

Cook, G., Bright, K. and Luck, R. (2001) Influence of colour on the inclusivity of an environment. In: Include 2001: an international conference on inclusive design and communications, 18-20 Apr 2001, Royal College of Art, London.

Cook, G., Bright, K. and Luck, R. (2001) Project Crystal: englightening communication. In: Deafhood: meeting the challenges of a changing world, 12-14 Jul 2001, City University, London.

Fisher, N. and Green, S. (2001) Partnering and the UK construction industry the first ten years: a review of the literature. In: Modernising Construction. National Audit Office, London, pp. 58-66. ISBN 010276901X

Green, S. (2001) Towards a critical research agenda in construction management. In: CIB World Congress 2001, 2-6 Apr 2001, Wellington, New Zealand.

Green, S. (2001) Towards an integrated script for risk and value management. International Project Management Journal, 7 (1). pp. 52-58. ISSN 1455-4186

Hughes, W. (2001) Evaluating plans of work. Engineering, Construction and Architectural Management, 8 (4). pp. 272-283. ISSN 0969-9988

Hughes, W. and Murdoch, J. R. (2001) Roles in construction projects: analysis and terminology. Construction Industry Publications, Birmingham, pp176. ISBN 1852638982

Hughes, W., Hillebrandt, P.M., Lingard, H. and Greenwood, D.G. (2001) The impact of market and supply configurations on the costs of tendering in the construction industry. In: CIB World Building Congress 2001: Performance in Product and Practice, 2-6 April 2001, Wellington New Zealand.

Loosemore, M. and Hughes, W. (2001) Confronting social defence mechanisms: avoiding disorganization during crises. Journal of Contingencies and Crisis Management, 9 (2). pp. 73-87. ISSN 1468-5973

Luck, R. and Bright, K. (2001) Deafness, design, and communication: an overview of Project Crystal. In: Assistive Technologies for Vision and Hearing Impairment: support technologies for independent living and work, 29-31 Aug 2001, Castelvecchio Pascoli, Italy.

Luck, R. and Haenlin, H. (2001) Developing shared language and value. In: CIB WO96 Architectural Management & Design Research Society Conference: Value through design, 14-15 Sep 2001, Reading, UK.

Luck, R., Haenlein, H. and Bright, K. (2001) Project briefing for accessible design. Design Studies, 22 (3). pp. 297-315. ISSN 0142-694X

Mutti, C. and Hughes, W. (2001) Contemporary organizational theory in the management of construction projects. In: 17th Annual ARCOM Conference, 5-7 September 2001, University of Salford, pp. 457-468.

Weller, S., Green, S. and Williams, M. (2001) Learning across business sectors: context, embeddedness and conceptual chasms. In: Proc.17th Annual ARCOM Conference, University of Salford, pp. 557-565.

Whyte, J. (2001) Virtual reality as a visualisation tool: benefits and constraints. International Journal of IT in Architecture, Engineering and Construction (IT-AEC), 2 (4). pp. 216-224. (special issue 'Visualisation in architecture, engineering and construction')

2000

Bright, K., Cook, G. and Luck, R. (2000) Deafness, design and communication in the built environment. In: COBRA 2000, 30 Aug - 1 Sept 2000, University of Greenwich, London.

Doyle, A. and Hughes, W. (2000) The influence of project complexity on estimating accuracy. In: 16th Annual ARCOM Conference, 6-8 Sep 2000, Glasgow Caledonian University, pp. 623-634.

Green, S. (2000) A critical interpretation of the formulation of construction best practice. In: CIB joint meeting W55 / W65 / TG23 / TG31 / TG35, 13-15 Sep 2000, University of Reading, UK.

Green, S. (2000) The future of lean construction: a brave new world. In: 9th Conference of the International Group for Lean Construction (IGLC 9), 17-19 Jul 2000, University of Sussex, UK.

Hillebrandt, P. M. and Hughes, W. (2000) What are the costs of procurement and who bears them? In: 2nd Int. Conf on Construction in Developing Countries, 15-17 November 2000, Gaborone, Botswana..

Hughes, W., Hillebrandt, P. and Murdoch, J. (2000) The impact of contract duration on the cost of cash retention. Construction Management and Economics, 18 (1). pp. 11-14. ISSN 0144-6193

Kagioglou, M., Cooper, R., Aouad, G. and Sexton, M. (2000) Rethinking construction: the Generic Design and Construction Process Protocol. Engineering Construction and Architectural Management, 7 (2). pp. 141-153. ISSN 1365-232x

Lu, S.-L. (2000) The automatic layout model in the sequencing of construction activities of multi-objective diaphragm wall unit by using self-learning neural network. In: 17th IAARC/CIB/IEEE/IFAC/IFR International Symposium on Automation and Robotics in Construction (IAARC 2000), 18-20 Sep 2000, Taipei, Taiwan, pp. 1-8.

Lu, S.-L. (2000) Combining self-learning neural network and neighbor search algorithms to solve the TSP problems. Transportation Planning Journal, 29 (2). pp. 281-294.

Lu, S.-L. (2000) An optimization for construction earthwork resource deployment by using artificial neural network. Journal of Cheng Shiu Junior College of Technology & Commerce, 13. pp. 69-77.

Lu, S.-L. (2000) The study of using self-learning neural network in automatic construction-site layout. In: 17th IAARC/CIB/IEEE/IFAC/IFR International Symposium on Automation and Robotics in Construction (IAARC 2000), 18-20 Sep 2000, Taipei, Taiwan.

Lu, S.-L. (2000) Study on the optimal model using self-learning neural network for the layout of construction engineering material. Journal of Cheng Shiu Junior College of Technology & Commerce., 13. pp. 61-67.

Luck, R. (2000) Does inclusive design require an inclusive design process? In: CoDesigning 2000: Collaborative Design, 11-13 Sep 2000, Coventry University, UK, pp. 71-81.

Matthews, J., Pellew, L., Phua , F. and Rowlinson, S. (2000) Quality relationships : partnering in the construction supply chain. International Journal of Quality and Reliability Management, 17 (4/5). pp. 493-510. ISSN 0265-671X

Murdoch, J.R. and Hughes, W. (2000) Construction contracts: law and management (3rd edition). E & F N Spon, London, pp381. ISBN 9780419261704

Rowlinson, S., Matthews, J., Phua, F., McDermott , P. and Chapman , T. (2000) Emerging issues in procurement systems. Journal of Construction Procurement, 6. pp. 90-103. ISSN 1358-9180

Sarshar, M., Haigh, R., Finnemore, M., Aouad , G., Barrett, P.S., Baldry, D. and Sexton, M. G. (2000) SPICE: a business process diagnostic tool for construction projects. Engineering, Construction and Architectural Management, 7 (3). pp. 241-250. ISSN 0969-9988

Whyte, J., Bouchlaghem, N. and Thorpe, A. (2000) From CAD to virtual reality: modelling approaches, data exchange and interactive 3D building design tools. Automation in Construction, 10 (1). pp. 43-55. ISSN 0926-5805

Whyte, J., Duke, A., Anumba, C. J. and Bouchlaghem, N. M. (2000) Perspectives on an integrated construction project model. International Journal of Cooperative Information Systems, 9 (3). pp. 283-313. ISSN 0218-8430

1999

Aouad, G., Kagioglou, M., Cooper, R., Hinks, J. and Sexton, M. G. (1999) Technology management of IT in construction: a driver or an enabler? Logistics Information Management, 12 (1/2). pp. 130-137. ISSN 0957-6053

Barrett, P. S., Sexton, M. G. and Green, L. (1999) Integrated delivery systems for sustainable construction. Building Research and Information, 27 (6). pp. 398-405. ISSN 1466-4321

Bon, R. and Luck, R. (1999) Annual CREMRU-JCI survey of corporate real estate practices in Europe and North America: 1993-1998. Facilities, 17 (5/6). pp. 167-177. ISSN 0263-2772

Bon, R. and Luck, R. (1999) Outsourcing of property-related management functions in Europe and North America, 1993-1998. Construction Management and Economics, 17 (4). pp. 409-412. ISSN 1466-433X

Green, S. (1999) Organising the procurement process. In: Procurement Systems in Construction: A Guide to Best Practice. Spon, London, pp. 57-82. ISBN 9780419241003

Green, S. (1999) Partnering: the propaganda of corporatism? Journal of Construction Procurement, 5 (2). pp. 177-186. ISSN 1358-9180

Green, S. (1999) Towards an integrated script for risk and value management: insights from the dramaturgical metaphor. In: CIB W-55 & W-65 Joint Triennial Symposium, 9th September 1999, Cape Town, South Africa, pp. 906-915. (Unpublished) (Proc. of CIB W-55 & W-65 Joint Triennial Symposium, Customer Satisfaction: A Focus on Research and Practice in Construction)

Green, S. and Simister, S. (1999) Modelling client business processes as an aid to strategic briefing. Construction Management and Economics, 17 (1). pp. 63-76. ISSN 1466-433X

Green, S. D. (1999) The dark side of lean construction: exploitation and ideology. In: IGLC-7: the 7th Conference of the International Group for Lean Construction, University of California, Berkeley, USA, pp. 21-32.

Green, S. D. (1999) The missing arguments of lean construction. Construction Management and Economics, 17 (2). pp. 133-137. ISSN 1466-433X

Green, S. D. (1999) A participative research strategy for propagating soft methodologies in value management practice. Construction Management and Economics, 17 (3). pp. 329-340. ISSN 1466-433X

Green, S. D. (1999) Partnering: the propaganda of corporatism. In: Ogunlana , S. D. (ed.) Profitable Partnering in Construction Procurement. Taylor & Francis, London, pp. 2-8. ISBN 9780419247609

Hughes, W., ed. (1999) Procs. 15th annual ARCOM conference Proceedings of the fifteenth annual conference 1999, September 15-17, Liverpool John Moores University. Association of Researchers in Construction Management, Reading, pp777. ISBN 9780953416127

Hughes, W. and Shinoda, H. (1999) Achieving satisfactory contractual terms for the engineer's role. In: 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool John Moores University, pp. 597-606.

Lu, S.-L. (1999) The research of quality function development application for construction industry. In: 1st Academic Conference on Construction Management, 28th-29th April, Taipei, Taiwan. (Unpublished)

Whyte, J., Bouchlaghem, N., Thorpe, A. and McCaffer, R. (1999) A survey of CAD and virtual reality within the house building industry. Engineering, Construction and Architectural Management, 6 (4). pp. 371-379. ISSN 0969-9988

1998

Aouad, G., Hinks, J., Cooper, R., Sheath, D., Kagioglou, M. and Sexton, M. G. (1998) An IT map for the generic design and construction process protocol. Journal of Construction Procurement, 4 (2). pp. 22-44. ISSN 1358-9180

Green, S. (1998) The technocratic totalitarianism of construction process improvement: a critical perspective. Engineering, Construction and Architectural Management, 5 (4). pp. 376-386. ISSN 0969-9988

Green, S. and Moss, G.W. (1998) Value management and post-occupancy evaluation: closing the loop. Facilities, 16 (1-2). pp. 34-39. ISSN 0263-2772

Hughes, W., Hillebrandt, P. and Murdoch, J. R. (1998) Financial protection in the UK building industry: a guide for clients and the construction supply chain. Thomas Telford Publications, London, pp24. ISBN 0727727176

Hughes, W., Hillebrandt, P.M. and Murdoch, J. (1998) Financial protection in the UK building industry: bonds, retentions and guarantees. Taylor & Francis, London, pp208. ISBN 9780419242901

Lingard, H., Hughes, W. and Chinyio, E. (1998) The impact of contractor selection method on transaction costs: a review. Journal of Construction Procurement, 4 (2). pp. 89-102. ISSN 1358-9180

Loosemore, M. and Hughes, W. (1998) Reactive crisis management in construction projects. Journal of Contingencies and Crisis Management, 6 (1). pp. 23-34. ISSN 1468-5973

Luck, R. (1998) Annual CREMRU-JCI survey of corporate estate management practices in Europe and North America: 1993-1997. Facilities, 16 (3-4). pp. 82-92. ISSN 0263-2772

Luck, R. (1998) Studying the effect of systemisation on design activity. In: Hughes, W. (ed.) 14th Annual ARCOM Conference. ARCOM, pp. 340-346. ISBN 0953416100

1997

Green, S. and Simister, S.J. (1997) Recurring themes in value management practice. Engineering, Construction and Architectural Management, 4 (2). pp. 113-125. ISSN 0969-9988

Hughes, W. (1997) Construction management contracts: law and practice. Engineering, Construction and Architectural Management, 4 (1). pp. 59-79. ISSN 0969-9988

Hughes, W., Gray, C. and Murdoch, J. (1997) Specialist trade contracting: a review. CIRIA Publications, London, pp104. ISBN 9780860174653

1996

Green, S. (1996) Group decision support for value management. In: CIB W065 8th International Symposium: Organisation and Management in Construction: Shaping Theory and Practice, 28 Aug - 3 Sep 1996, Glasgow, UK, pp. 529-540.

Green, S. (1996) Theoretical perspectives on the development of a meta-methodology for value management. In: CIB W092 International Symposium on Procurement Systems: North meets South: developing ideas, 14-17 Jan 1996, Durban, South Africa, pp. 168-179.

Green, S. (1996) Value management in construction: a client's guide. CIRIA, London, pp73. ISBN 970860164522

Green, S. and Simister, S.J. (1996) Rhetoric and reality: a social constructivist research agenda for business process re-engineering in construction. In: Langford, D. and Retik, A. (eds.) The organization and management of construction: shaping theory and practice. Spon Press, London, pp. 529-540. ISBN 9780419222408

Green, S. D. (1996) A metaphorical analysis of client organisations and the briefing process. Construction Management and Economics, 14 (2). pp. 155-164. ISSN 1466-433X

Luck, R. (1996) The case for the integration of project participants' activities within a construction project environment. In: CIB W065 8th International Symposium: Organisation and Management in Construction: Shaping Theory and Practice, 1996, Glasgow, UK.

Luck, R. (1996) Construction project integration strategies. In: EPSRC/IMI Partnering and Supply Chain Management Seminar, 1996, Salford, UK, pp. 72-87.

Murdoch, J. and Hughes, W. (1996) Construction contracts: law & management. 2nd edition. Spon Press, London, pp448. ISBN 9780419207603

1995

Lansley, P., Luck, R. and Lupton, S. (1995) The organization of construction research in British universities. Engineering, Construction and Architectural Management, 2 (3). pp. 179-195. ISSN 0969-9988

1994

Green, S. (1994) Beyond value engineering: SMART value management for building projects. International Journal of Project Management, 12 (1). pp. 49-56. ISSN 0263-7863

Green, S. (1994) A paradigm crisis in value management? In: Proc. 10th Annual ARCOM Conference, Loughborough Uinversity, UK, pp. 410-421.

Green, S. (1994) Sociological paradigms and building procurement. In: Proc. CIB W-92 Symposium, Procurement Systems: East meets West, Hong Kong, pp. 89-97.

Green, S. (1994) Value management and post-occupancy evaluation: closing the loop. In: Proc. 5th European Value Management Conference, Brighton, pp. 155-165.

Hughes, W., Gray, C. and Murdoch, J. (1994) Construction subcontracts: for what we are about to receive. In: 7th Annual Construction Law Conference, "Risk, Management and Procurement in Construction", September 1994, Centre for Construction Law and Management, King's College London, pp. 413-442.

Luck, R. (1994) Use of construction research by industry. In: 10th Annual ARCOM conference, 14-16 September 1994, Loughborough University. (Unpublished)

Luck, R. and Lansley, P. (1994) Construction research in UK universities and its use by industry. In: International Conference on Research, Higher Education in Building Construction, Ecole National . (Unpublished)

1993

Green, S. (1993) A reinterpretation of value management. In: Proc. CIB W-65, Organisation and Management in Construction - the Way Forward, Trinidad, pp. 437-445.

Hughes, W. (1993) Architects as conflict managers. In: CIB W-96 Architectural Management, Practice and Research, Faculteit Bouwkunde, Technische Universiteit Eindhoven, pp. 33-39.

1992

Green, S. (1992) Value engineering. In: Architects & Surveyors Yearbook and Reference Manual. Highwood, London, pp. 110-112. ISBN 1870339479

Green, S. D. (1992) Resolving conflict in the formulation of building design objectives. In: Fenn, P. and Gameson, R. (eds.) Construction Conflict: Management and Resolution. Taylor and Francis, London, pp. 95-107. ISBN 9780419181408

Green, S. D. (1992) A SMART methodology for value management. Chartered Institute of Building, Ascot, pp46. ISBN 9781853800559 (Occasional Paper No.53)

Green, S. D. (1992) Value engineering during design: new directions in research. In: Nicholson, M. P. (ed.) Architectural Management. Taylor and Francis, London, pp. 256-267. ISBN 9780419177807

1991

Hinks, J., Aouad, G., Cooper, R., Sheath, D., Kagioglou, M. and Sexton, M. G. (1991) IT and the design and construction process: a conceptual model of co-maturation. The International Journal of Construction IT, 5 (1). pp. 1-25.

1990

Green, S. (1990) The building industry of the future. In: The Ivanhoe Guide to Chartered Builders 1990. The Ivanhoe Press, pp. 67-72. ISBN 1870757165

Green, S. and Popper, P. (1990) Value engineering: the search for unnecessary cost. Occasional Papers, 39. Chartered Institute of Building, Ascot, pp53. ISBN 9781853800184

1989

Green, S. (1989) Tendering: optimization and rationality. Construction Management and Economics, 7 (1). pp. 53-63. ISSN 1466-433X

1988

Green, S. and Fisher, N. (1988) Education for project management. In: Project Management in Building. Chartered Institute of Building, Ascot, pp. 21-33. ISBN 1853800023

1987

Green, S. and Fisher, N. (1987) Post-professional education for project management. In: Proc. of 11th International Project Management Association Expert Seminar: New Trends in Project Management, pp. 277-292.

1984

Walker, A. and Hughes, W. (1984) Private industrial project management: a systems-based case study. Construction Management and Economics, 2 (2). pp. 93-110. ISSN 1466-433X

This list was generated on Thu Feb 23 03:23:12 2012 GMT.

Page navigation

 

Search Form